How a SteedForm job runs.

From the first plan through to the last piece installed: four steps, one team. Built around the rhythm of a construction schedule.

01Quote & selection+

Send through your selections schedule alongside architectural plans, or joinery drawings. We'll come back with an indicative quote — typically within 48 hours.

02Site measure+

Once cabinetry is in and ready, our measure team comes to site and digitally templates the space. The digital template flows straight into our saw programs ready to cut.

03Fabrication+

Slabs come into our 3,500-square-metre Wingfield factory, where the job is cut, polished and finished.

04Install & handover+

One of our installation crews delivers the finished pieces to site and installs them.